There is no floor that is not afraid of water. The

2022-07-22
  • Detail

There has always been a saying in the flooring industry that wood flooring is "three parts of the floor and seven parts of the installation", that is, the installation determines 70% of the floor quality. The unsatisfactory use of the floor is largely caused by the inadequate floor paving. The problem of floor paving has become a stubborn disease that restricts the use of the floor. The harm of summer rainstorm to the floor is also a headache for people

there has always been a saying in the flooring industry that wood flooring is “ Three parts of the floor and seven parts of the installation ”, That is, the installation determines 70% of the floor quality. The unsatisfactory use of the floor is largely caused by the inadequate floor paving. The problem of floor paving has become a stubborn disease that restricts the use of the floor. The harm of summer rainstorm to the floor is also a headache for people

bookish door, aesthetic floor, Flanner functional sofa

the floor paving in spring needs moisture-proof, three points of quality and seven points of installation

in spring, the floor must be kept dry and clean during use. In general, the moisture content of the floor should be kept at 8% - 13%. However, improper laying and use will also cause quality problems of the floor, such as the lack of moisture-proof treatment during laying; Wet with water or scrub with alkaline water or soap water, which will damage the brightness of the paint; The toilet and room floor are not well isolated; In summer, the curtain is not properly drawn, which makes the floor in front of the window change color and crack after being exposed to the scorching sun; Or the temperature of the air conditioner is turned on too low, so that the temperature difference between day and night changes too much, causing the floor to expand or contract too violently, causing deformation and cracking, etc

in addition, moisture resistance is the most important technical index of wood flooring. The floor with poor moisture-proof performance, in geothermal for a long time “ Steam roast ” Once moisture enters, the edge of the floor must be warped, causing damage to the floor. The high-quality floor adopts high-density substrate, which has excellent moisture-proof performance, and the water absorption thickness expansion rate is far less than the national standard. In addition, the special wear-resistant layer, decorative paper and balance layer can well integrate the substrate “ Closed ”, It ensures that the overall moisture-proof performance of the floor is better

floor installation is not easy. Floor laying should be “ The right time and place &rdquo

floor paving is not random, but to grasp “ The time, place and people are in harmony ” The paving principle of. Xu Guozhong, the supervisor, said that due to the large temperature difference between day and night in spring, attention should be paid to moisture-proof and other issues in the paving of floors and floor tiles. Therefore, before paving the wooden floor, it is best to lower it at room temperature of 16 to 18 for two days. In addition, the best time to install the floor is “ The time, place and people are in harmony ” Period of time. In short, weather refers to sunny weather. It is best to install it for about 7 days, which is sunny without rain; Geographical advantage requires that the floor should not be installed before the ground is completely dry. Renhe must find professional workers to install the floor for you. At the same time, professional damp proof mats are laid under the floor to prevent the floor from being damp

in particular, it is necessary to avoid walking and placing heavy objects within 48 hours after the floor is paved, leaving enough time for floor bonding

in summer, rainstorms often occur. How about soaking the floor

rainstorms are everywhere. Once there is a water leak in the home, I'm afraid the worst hit is the floor. Is the floor irretrievable once it is soaked in water? Don't worry, as long as you calmly diagnose the pulse and handle it properly in time, maybe you can make it “ Bring the dead back to life ”, Set foot on “ Job ”. For wooden floors that are not seriously soaked, in addition to sucking up the surface water in the shortest time, small areas can use a vacuum cleaner to suck away the water vapor from the splicing gap of the water soaked wooden floor, or take a hair dryer and dry it with cold air, but do not use hot air to prevent the surface from cracking and deformation caused by heating and drying. The soaking area is relatively large, so it can be considered to use air conditioning refrigeration to dehumidify. Close the doors and windows of the room, and turn the air conditioner on to the lowest temperature. Most of them can dry in about a day. If the wooden floor is seriously flooded, the problem cannot be solved by electrical dehumidification alone. What should we do

“ It is very important to dry in the shade while trying to keep the floor from deformation& rdquo; According to Yuanhong, Henan general manager of Shengda flooring, solid wood flooring and laminate flooring are more commonly used in Zhengzhou families at present. He suggested that the owner should inform the professional customer service personnel of the floor manufacturer to come to the site for treatment while cleaning the site. There is really no way, and we should handle it carefully according to different situations

purchase misunderstanding: not afraid of blisters is the floor is not a good floor

at present, the vast majority of wooden floors on the market are only “ The surface is waterproof and the whole is moisture-proof ”. Yuan Hong told reporters, “ The floor is still afraid of water. Wood itself is something with life characteristics. As long as the fiber in it is still there, the influence of water on it will not disappear. In other words, as long as it is wood, it will be afraid of water, and it will inevitably deform after long-term immersion& rdquo; Some businesses claim that their laminate flooring can soak in water, which is not really afraid of soaking, but has a time limit. Generally speaking, it is not afraid within 12 hours, but not more than 12 hours. The deformation of solid wood floor is determined by the water absorption of wood, which is also related to the baking technology of the manufacturer

“ Three parts of the floor and seven parts of the installation ”, Whether the moisture-proof performance of the floor is good or not requires not only the qualified indicators of the floor itself, but also the installation determines the moisture-proof function of the floor, and the moisture-proof protection of the floor in daily life is also crucial

佛山男科医院

北京眼科医院

杭州肿瘤医院

成都男科医院

Copyright © 2011 JIN SHI